Walthamstow Central Subway Case Study
Problem The structure is a cut and cover reinforced concrete box that acts as asubway link between Walthamstow Central and the Waltham Forrest BusStation. The surface area of the internal structure is approximately1500m².The structure was commissioned as part of the pre PPP contracts.The chosen design solution was a Bentonite matt. This failed to beeffective and …