Project

Walthamstow Central Subway Case Study

Problem The structure is a cut and cover reinforced concrete box that acts as asubway link between Walthamstow Central and the Waltham Forrest BusStation. The surface area of the internal structure is approximately1500m².The structure was commissioned as part of the pre PPP contracts.The chosen design solution was a Bentonite matt. This failed to beeffective and …

Walthamstow Central Subway Case Study Read More »

Sun Hung Kai/MTRC Case Study

Problem The IFC building is one of the most prestigious commercial buildings onHong Kong Island. The structure is constructed upon reclaimed Harbourland and consists of a mixture of reinforced concrete and concrete blockwork. The design water ingress solution was not as effective as anticipated.After only three years, severe saline water ingress penetrated through theperimeter walls.The …

Sun Hung Kai/MTRC Case Study Read More »

Park West, UK Case Study

Problem Park West is London`s largest residential building with a massivebasement of several thousand sqm. The asset management hired CardoeMartin Burr Limited, which is an independent multi-disciplined practiceproviding Building Surveying and Property Consultancy services.Cardoe Martin contacted us to see if our system could stop the heavywater ingress in the basement. The asset management wanted to …

Park West, UK Case Study Read More »

Donggang Cable Tunnel, Dalian, China Case Study

Problem The structure is a cut and cover tunnel reinforced concrete box that acts asa cable and utility tunnel. The surface area of the total internal structure is170.000sqm. The targeted area for the installation was 43.000sqm.The tunnel is placed on reclaimed land and consists mostly of wet clay.The water ingress problems started even before the …

Donggang Cable Tunnel, Dalian, China Case Study Read More »